
Add to Cart
Product name | Sand Blasting Crane Loading Deck |
| The Crane Loading Deck is specially designed for coping with the challenges of multi-story construction sites. Our crane loading decks make access for tools and materials to different levels of multi-story construction sites safe and simple, while increase the working efficiency of tower cranes. |
Features | Crane Loading Deck Features 1. Easy pull/push system 2. Max. outboard length:5.3m 3. Max. load capacity:5ton 4. Platform width: from 2.2m to 4.2m 5. With adjustable props for different floor heights 6. Compact design makes the transportation & installation much easier 7. With easy locking system 8. All pins are with chains |
Specification | MLP2200 | MLP2600 | MLP3200 |
---|---|---|---|
Width W (mm) | 2200 | 2600 | 3200 |
Length L1-L2 (mm) | |||
- Minimum Length | 5650 | 5650 | 5650 |
- Maximum Length | 9400 | 9400 | 9400 |
Height of prop H2 (mm) | |||
- Minimum Height | 2600 | 2600 | 2600 |
- Maximum Height | 3400 | 3400 | 3400 |
Side panel height H1 (mm) | 1200 | 1200 | 1200 |
Extend length of movable deck L2 (mm) | 3750 | 3750 | 3750 |
Overhang length of stationary frame L5 (mm) | 1450 | 1450 | 1450 |
Tare Weight (KG) | 2300 | 2800 | 3350 |
Max Loading Weight (KG) | 5000 | 5000 | 5000 |
① Safe and reliable:
Distinctively designed, delicate production, and quality tested.
Product serialization:
There are three sizes available for the Retractable Unloading Platform, with different load capacities, width sizes, and floor heights to meet the needs of various users.
③ Good compatibility:
It can be applied to almost all types of buildings and will not hinder the completion of the building exterior.
Suitable for floors of different heights — the height of the supporting columns can be adjusted.
If the ceiling is high, support columns over 4 meters can be provided, or full body bolts can be used to anchor the platform directly to the floor (without the need for support columns).
④ Quick and convenient installation and disassembly:
Upon arrival at the construction site, the load deck can be installed and used immediately.
Installation can be completed by one crane driver and one worker.
Transfer to another floor or removal from the site can be done within 10 minutes.
⑤ Humanized design:
Extremely low maintenance costs.
The platform can be extended and retracted by only one person, without the need for power or control equipment.
⑥ Long service life:
Adopts hot-dip galvanizing and high-quality paint for corrosion prevention.